Qualify the Complete Wafer Package
Loaded heightAccount for wafer count, separator thickness, top and bottom cushions, liner arrangement and available jar depth.
Material selectionMatch cushion, separator and liner materials to the handling process, permitted contact surfaces, particle limits and ESD requirements.
DocumentationIf cleanliness, material testing or certification documentation is required, specify it with the selected product so applicability can be confirmed.